Identity

Give the drawing and each retained sample a traceable identifier. The sample label should tie to the part revision, material and production or trial lot.

Change log

Record changes to geometry, closure, material, packaging or process by feature. Tie the change entry to the issue it addresses and the test or document that will verify it.

Approval

List who reviewed the drawing and who signed the relevant sample, and when. Make clear whether approval covers appearance, fit, a single trial or production release.

Obsolete

Keep obsolete files for traceability and mark their effective replacement. Provide controlled copies of the active version to operations and review any open order referencing an older version.

Drawing revision and retained-sample register

RecordWhat to captureYour notes
IdentityPart/drawing ID, revision, sample ID and lot
Change logFeature, previous/new state, reason and verification
ApprovalReviewer, approval date/scope and sign-off evidence
ObsoleteSuperseded revision, replacement, date and affected orders

Questions buyers ask

Can a new photo replace the approved drawing?

Only through the agreed revision process with the relevant changes documented.

What should repeat orders reference?

Use the approved revision, retained sample and any explicitly accepted changes.