Identity
Give the drawing and each retained sample a traceable identifier. The sample label should tie to the part revision, material and production or trial lot.
Change log
Record changes to geometry, closure, material, packaging or process by feature. Tie the change entry to the issue it addresses and the test or document that will verify it.
Approval
List who reviewed the drawing and who signed the relevant sample, and when. Make clear whether approval covers appearance, fit, a single trial or production release.
Obsolete
Keep obsolete files for traceability and mark their effective replacement. Provide controlled copies of the active version to operations and review any open order referencing an older version.
Drawing revision and retained-sample register
| Record | What to capture | Your notes |
|---|---|---|
| Identity | Part/drawing ID, revision, sample ID and lot | |
| Change log | Feature, previous/new state, reason and verification | |
| Approval | Reviewer, approval date/scope and sign-off evidence | |
| Obsolete | Superseded revision, replacement, date and affected orders |
Questions buyers ask
Can a new photo replace the approved drawing?
Only through the agreed revision process with the relevant changes documented.
What should repeat orders reference?
Use the approved revision, retained sample and any explicitly accepted changes.